• DocumentCode
    3432787
  • Title

    Using simulation and daily-demand method to analyze the capacity utilization for product-mix in semiconductor fabrication

  • Author

    Hung, Ming-Hsin ; Wang, Edward ; Wang, Ivan

  • fYear
    2002
  • fDate
    10-11 Dec. 2002
  • Firstpage
    302
  • Lastpage
    306
  • Abstract
    This paper focuses on how to use Daily-Demand Method (DDM) to translate a simulation model into a capacity analysis model, which can be manipulated on finding the maximum capacity of product-mix, prediction of bottlenecks and optimization of capacity. Using DDM not only can consider the variant limitations of semiconductor fabrication but also improve the run time of simulation. In comparison to a steady-state simulation, DDM can save time from hours to less than 10 minutes. This methodology has successfully implemented at MXIC Fab-2 from Jul 2002. In this paper, we provide several examples of Fab-2´s application, as well as the findings of capacity utilization.
  • Keywords
    electronics industry; optimisation; semiconductor process modelling; Fab-2 application; MXIC Fab-2; bottlenecks; capacity analysis model; daily demand method; optimisation; semiconductor fabrication; simulation model; steady state simulation; Analytical models; Costs; Distributed decision making; Fabrication; Manufacturing industries; Predictive models; Production facilities; Semiconductor device modeling; Steady-state; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Technology Workshop, 2002
  • Print_ISBN
    0-7803-7604-8
  • Type

    conf

  • DOI
    10.1109/SMTW.2002.1197453
  • Filename
    1197453