Title :
Notice of Retraction
The model for risk identification based on systems engineering
Author :
Wei Wang ; Jiaduo Wu ; Dongyu Wang
Author_Institution :
Dept. of Reliability & Syst. Eng., Beihang Univ., Beijing, China
Abstract :
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
With the increasing complexity of modern defense system, the risk of its development process is increasing rapidly. Therefore, it is important to manage the risks in the development process effectively. As the first step of risk management (RM), risk identification (RI) is of great significance to the effect of RM. In this paper, a model for RI based system engineering (SE) is proposed. By this model, the engineering activities in the product development process can be found and then, according to these engineering activities, the risks can be identified comprehensively and effectively, which is a solid foundation to RM.
Keywords :
computational complexity; risk management; systems engineering; RI-based SE; RI-based system engineering; RM; defense system; engineering activities; risk identification; risk management; Control systems; Modeling; Process control; Reliability engineering; Schedules; product development; risk identification; risk management; systems engineering;
Conference_Titel :
Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4799-1014-4
DOI :
10.1109/QR2MSE.2013.6625530