• DocumentCode
    3437560
  • Title

    Notice of Retraction
    An optimal policy for maintenance, intermediate buffer, and spare parts

  • Author

    Shuyuan Gan ; Zhisheng Zhang ; Yifan Zhou

  • Author_Institution
    Dept. of Mech. Eng., Southeast Univ., Nanjing, China
  • fYear
    2013
  • fDate
    15-18 July 2013
  • Firstpage
    643
  • Lastpage
    648
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    Most research on maintenance is devoted to separate maintenance policy, and some other is focused on maintenance optimization with buffer or spare parts considered. However, there is no existing research taking into account maintenance, buffer, and spare parts together. In this paper, an optimal policy is proposed for a production-inventory system, in which the buffer size, the initial time of buffer accumulation, the predetermine age for preventive maintenance, and the spare part arrival time are optimized together by using Monte Carlo simulation and enumeration method. Numerical examples are delivered for sensitivity analysis of key system parameters. Additionally, the same value of minimal long-term expected cost rate is obtained during repetitive optimizations, which can be considered as the accuracy verification of proposed method.
  • Keywords
    Monte Carlo methods; inventory management; optimisation; preventive maintenance; sensitivity analysis; Monte Carlo simulation; buffer accumulation; buffer size; enumeration method; intermediate buffer; maintenance optimization; maintenance policy; minimal long-term expected cost rate; optimal policy; predetermine age; preventive maintenance; production-inventory system; repetitive optimizations; sensitivity analysis; spare part arrival time; system parameters; Joints; Market research; Monte Carlo methods; Optimization; Preventive maintenance; Sensitivity analysis; Monte Carlo simulation; buffer; maintenance; sensitivity analysis; spare parts;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4799-1014-4
  • Type

    conf

  • DOI
    10.1109/QR2MSE.2013.6625661
  • Filename
    6625661