• DocumentCode
    3438050
  • Title

    Datacenter net profit optimization with deadline dependent pricing

  • Author

    Wang, Wei ; Zhang, Peng ; Lan, Tian ; Aggarwal, Vaneet

  • Author_Institution
    Dept. of ECE, George Washington Univ., Washington, DC, USA
  • fYear
    2012
  • fDate
    21-23 March 2012
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper considers deadline dependent pricing and its impact to datacenter net profit optimization. We formulate the problem by jointly maximizing total revenue as a function of individual job deadlines and minimizing electricity cost through job scheduling over different time and locations. These two complementary objectives-the maximization of revenue and the minimization of cost-are mutually-dependent due to the coupling of job completion time and scheduling decisions. Lever-aging a new approximation method for job completion time, we develop two low-complexity, distributed algorithms for the net profit optimization. Through numerical evaluations, we show the efficacy of the proposed algorithms as well as the net profit improvements.
  • Keywords
    approximation theory; computational complexity; computer centres; cost reduction; distributed algorithms; investment; optimisation; profitability; approximation method; datacenter net profit optimization; deadline dependent pricing; electricity cost minimization; individual job deadlines; job completion time; job scheduling; jointly total revenue maximization; low-complexity distributed algorithm; net profit improvement; numerical evaluation; scheduling decisions; Computational modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Sciences and Systems (CISS), 2012 46th Annual Conference on
  • Conference_Location
    Princeton, NJ
  • Print_ISBN
    978-1-4673-3139-5
  • Electronic_ISBN
    978-1-4673-3138-8
  • Type

    conf

  • DOI
    10.1109/CISS.2012.6310925
  • Filename
    6310925