DocumentCode
3442143
Title
Jacksonville´s Automated Skyway Express
Author
Abbas, Joseph D.
Author_Institution
ICF Kaiser Eng. Inc., Jacksonville, FL, USA
fYear
1991
fDate
21-23 May 1991
Firstpage
103
Lastpage
115
Abstract
On May 30, 1989, the Jacksonville (Florida) Transportation Authority (JTA) commenced operations of the Phase 1A, starter line of their Automated Skyway Express (ASE), an automated guideway transit system. The starter line, which consists of 0.7 miles of double track with three passenger stations, is the first segment of the Jacksonville 2.5 mile, nine passenger station, totally automated aerial system. After 19 months of operation, the system is running with 99.5% availability and 99.7% schedule adherence, while carrying over 600000 passengers. Design is now underway for the completion of the Phase 1 System. The history of the system is described, from initial concept through the present operating system, to the present expansion plans. Some unique system features and some challenging aspects of the system design are addressed
Keywords
railways; rapid transit systems; traction; traffic computer control; Automated Skyway Express; Florida; Jacksonville; automated guideway transit system; Cities and towns; Costs; Engineering management; History; Instruments; Operating systems; Project management; Proposals; Transportation; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Railroad Conference, 1991., Proceedings of the 1991 IEEE/ASME Joint
Conference_Location
St. Louis, MO
Print_ISBN
0-7803-0072-6
Type
conf
DOI
10.1109/RRCON.1991.160934
Filename
160934
Link To Document