DocumentCode :
3442779
Title :
The elevator upgraded the application research
Author :
Wang, Feng ; Zhu, Jianqu ; Xie, Dong
Author_Institution :
Coll. of Mech. & Power Eng., Chongqing Univ. of Sci. & Technol., Chongqing, China
fYear :
2012
fDate :
22-24 Aug. 2012
Firstpage :
444
Lastpage :
447
Abstract :
The old-fashioned elevator in our country in high-rise building house has certain proportion, is in urgent need of the reconstruction and upgrade. This subject from the elevator safety, elevator structure, automation technology application, and on the elevator reconstruction research, and put forward some ideas and reconstruction scheme.
Keywords :
lifts; maintenance engineering; safety; elevator automation technology; elevator reconstruction; elevator safety; elevator structure; elevator upgrade; high-rise building house; Delay; Elevators; Frequency control; Frequency conversion; Inverters; Resistance; Synchronous motors; application design; elevator reconstruction; frequency converter; safe and reliable;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cognitive Informatics & Cognitive Computing (ICCI*CC), 2012 IEEE 11th International Conference on
Conference_Location :
Kyoto
Print_ISBN :
978-1-4673-2794-7
Type :
conf
DOI :
10.1109/ICCI-CC.2012.6311189
Filename :
6311189
Link To Document :
بازگشت