DocumentCode :
3442828
Title :
Open Field Test Site attenuation repeatability in accordance with FCC/OET 55
Author :
Usoskin, Alexander ; Usoskin, Alex
Author_Institution :
Hermon Labs. EMC Ltd., Nazaret Illit, Israel
fYear :
1992
fDate :
2-5 Nov 1992
Firstpage :
1
Abstract :
As of 1 June 1991 Federal Communication Commission lists 190 Contract Test Sites: 103 of these are located in the USA, 39 in Japan, 11 in Taiwan, seven in Canada, five in Germany, four in England and only one in Israel. Hermon Labs. Open Field Test Site was built in the beginning of 1988 and listed with FCC from June 1988. In spite of FCC demands every three years for recalibrations (site attenuation measurements) Hermon Labs. is doing this measurement each half year. An analysis of the measurements is given
Keywords :
attenuation measurement; radiofrequency interference; test facilities; Contract Test Sites; Open Field Test Site; attenuation repeatability; site attenuation measurements; Antenna measurements; Antenna theory; Area measurement; Attenuation measurement; Electrical capacitance tomography; FCC; Impedance matching; Laboratories; Noise measurement; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electromagnetic Compatibility, 1992. From a Unified Region to a Unified World., 1992 Regional Symposium on
Conference_Location :
Tel-Aviv
Print_ISBN :
0-7803-0725-9
Type :
conf
DOI :
10.1109/ISEMC.1992.257579
Filename :
257579
Link To Document :
بازگشت