Abstract :
Electric Utilities permitting interconnection of generation (small and/or large) on their power systems have long had standards which any entity wishing to interconnect has to meet. Recently the growing importance of distributed generation (mostly less than 10 MVA), especially using renewable sources, has prompted the creation of IEEE Std. 1547 which sets requirements and guidelines for interconnecting a distributed resource with an electric power system. This paper will examine the requirements of the Std. IEEE 1547 and compare them with the interconnection requirements currently used by a number of randomly selected utilities.
Keywords :
distributed power generation; electric generators; energy resources; power system interconnection; distributed generation; distributed resources; electric power system; interconnection of generation; power systems interconnection; renewable sources; Design engineering; Distributed control; Energy resources; Guidelines; Power engineering and energy; Power generation; Power system interconnection; Standards development; Testing; Voltage fluctuations; Distributed Energy Resources; Generators; Interconnection; Renewable Energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Rural Electric Power Conference, 2008 IEEE
Conference_Location :
Charleston, SC
Print_ISBN :
978-1-4244-2147-3
Electronic_ISBN :
978-1-4244-2148-0
Type :
conf
DOI :
10.1109/REPCON.2008.4520139
Filename :
4520139
Link To Document :
بازگشت