DocumentCode :
3444568
Title :
The Bellcore Reliability Prediction Procedure (RPP); 1988 edition
Author :
Black, Allen L. ; Martin, William J., III
Author_Institution :
Bell Commun. Res., Red Bank, NJ, USA
fYear :
1988
fDate :
28 Nov-1 Dec 1988
Firstpage :
70
Abstract :
The authors describe the 1988 edition of the Bellcore Reliability Prediction Procedure for electronic equipment (RPP), with particular emphasis on additions and improvements incorporated in the last four year. They also describe a software system developed by Bellcore to mechanize generation of RPP predictions. The RPP and its automated version, the ARPP, include formulas for both steady-state and infant mortality reliability prediction. In addition to generic reliability prediction, the RPP/ARPP includes methods for reliability prediction using laboratory life test data and field reliability data
Keywords :
failure analysis; reliability; Bellcore Reliability Prediction Procedure; electronic equipment; generic reliability prediction; infant mortality; software system; steady state reliability; Communication standards; Electronic equipment; Laboratories; Prediction methods; Predictive models; Procurement; Production facilities; Springs; Telecommunication network reliability; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Global Telecommunications Conference, 1988, and Exhibition. 'Communications for the Information Age.' Conference Record, GLOBECOM '88., IEEE
Conference_Location :
Hollywood, FL
Type :
conf
DOI :
10.1109/GLOCOM.1988.25812
Filename :
25812
Link To Document :
بازگشت