• DocumentCode
    3445572
  • Title

    Executing process models: activity and project management

  • Author

    Chroust, Gerhard ; Hardt, Stefan

  • Author_Institution
    Systemtech. und Autom., Johannes Kepler Univ., Linz, Austria
  • fYear
    1996
  • fDate
    11-15 Mar 1996
  • Firstpage
    364
  • Lastpage
    370
  • Abstract
    Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management
  • Keywords
    planning; project management; software development management; activity management; integrated software engineering environment; process model execution; project management; requirements; resource-oriented control; resource-oriented planning; software development process; software process enactment; software product development; Automatic control; Automation; Humans; Predictive models; Process planning; Programming; Project management; Resource management; Software development management; Software engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering of Computer-Based Systems,1996. Proceedings., IEEE Symposium and Workshop on
  • Conference_Location
    Friedrichshafen
  • Print_ISBN
    0-8186-7355-9
  • Type

    conf

  • DOI
    10.1109/ECBS.1996.494562
  • Filename
    494562