Title :
On-site testing of cable systems after laying, monitoring with HF partial discharge detection
Author_Institution :
KEMA Nederland B.V., Arnhem
Abstract :
At KEMA, a new high frequency measuring technique is developed to detect partial discharges in HV polymer insulated power cables and accessories. This complete system makes it possible to perform on-site PD measurements focused on accessories, without any connection to high voltage parts of the system. The measurements are based on newly developed techniques, while the PD determination is based on traditional rules because of the PD-phase-angle relation. The first field measurements with this complete system are presently being performed
Keywords :
cable jointing; cable laying; electric connectors; electric current measurement; insulation testing; organic insulating materials; partial discharges; polymers; power cable insulation; power cable testing; HF partial discharge detection; HV power cables; PD measurements; field measurements; monitoring; on-site testing; phase-angle relation; polymer insulation breakdown; power cable accessories;
Conference_Titel :
Supertension, IEE Two Day Colloquium on
Conference_Location :
London
DOI :
10.1049/ic:19951346