Title :
Transfer of the phase process through the border between two time scales
Author :
Dobrogowski, Andrzej
Author_Institution :
Inst. of Electron. & Telecommun., Poznan Tech. Univ., Poland
Abstract :
The transfer of a digital signal across the border between different time scales can be effectively analysed in terms of synchronization of corresponding gapped clocks clocking the data stream at both sides of the border. Analysis is strongly supported by graphs presented in the paper. Parameters of synchronization process (e.g., PJE rate, hysteresis) depend on the elastic store capacity and pattern of gaps (including justification) of gapped clocks
Keywords :
synchronisation; PJE rate; Virtual Container level 4; border between time scales; data stream clocking; digital communication network; digital signal transfer; elastic store capacity; gapped clocks; hysteresis; pattern of gaps; phase process transfer; synchronization; synchronous digital hierarchy; timing pulses;
Conference_Titel :
European Frequency and Time Forum, 1996. EFTF 96., Tenth (IEE Conf. Publ. 418)
Conference_Location :
Brighton
Print_ISBN :
0-85296-661-X
DOI :
10.1049/cp:19960022