Abstract :
In this paper, we optimize the bonus-penalty structure of large-scale project on flexible resource-constraint with a Stackelberg model, and propose a parameter of Optimization-Level to analyze the impact about the Hire-Index influences on the degree of the optimization. We find that the optimization of Incentive-Intensity can make the bonus-penalty structure more effective, and the client will gain their maximal benefits. However, the project scheduling and the bonus-penalty structure can be optimized better, because of the flexible resource. The Hire-Index of the resource influences the degree of the optimization very much, and the lower the better, whereas the worse.
Keywords :
incentive schemes; optimisation; project management; scheduling; Stackelberg model; bonus-penalty structure; flexible resource-constrained view; hire-index influences; incentive-intensity; large-scale project scheduling problem; optimization-level; Costs; Forward contracts; Globalization; Large-scale systems; Project management; Resource management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1283
Filename :
4679191
Link To Document :
بازگشت