DocumentCode :
345217
Title :
Implementation of ramp control in RHIC
Author :
Kewisch, Jörg
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Volume :
2
fYear :
1999
fDate :
1999
Firstpage :
708
Abstract :
After the injection of beam into RHIC the beam energy is ramped from 10.8 GeV/u to 108 GeV/u and the beta function of the interaction points is reduced from 10 meters to 1 meter. The set points for magnet power supplies and RF cavities is changed during such ramps in concert. A system of Wave Form Generators (WFGs), interconnected by a Real Time Data Link (RTDL) and Event Link is used to control these devices. RHIC ramps use a two level system of WFGs: one transmits the beam energy and a “pseudo time” variable as functions of time via RTDL. The other calculates the device set points as functions of these RTDL variables. Energy scaling, saturation correction and the wiring of interaction region quadrupoles is performed on the second level. This report describes the configuration and implementation of the software, firmware and hardware of the RHIC ramp system
Keywords :
accelerator RF systems; accelerator control systems; accelerator magnets; colliding beam accelerators; ion accelerators; storage rings; synchrotrons; RF cavities; RHIC ramp control; RHIC ramp system; Real Time Data Link; Wave Form Generators; beta function; energy scaling; firmware a; hardware; interaction points; interaction region quadrupoles; magnet power supplies; saturation correction; software; Control systems; Hardware; Magnetic variables control; Microprogramming; Power supplies; Power system interconnection; Radio frequency; Real time systems; Saturation magnetization; Wiring;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
Type :
conf
DOI :
10.1109/PAC.1999.795329
Filename :
795329
Link To Document :
بازگشت