Title :
Implementation of magnetic measurements, errors, and their consequence in an optimized Fermilab 8-GeV transfer line
Author :
Assadi, S. ; Johnstone, J. ; Martin, P. ; Tecker, F. ; Yang, M.J.
Author_Institution :
Fermi Nat. Accel. Lab., Batavia, IL, USA
Abstract :
The purpose of the newly constructed 8 GeV transfer line is to provide a reliable interconnection of the Booster and the Main Injector. This transfer line is constructed from the combination of the permanent and electro-magnets. We present data obtained during the commissioning along with our experience of combined function permanent magnets, DC operation of the electro-magnets and optics model vs. measurement of the beamline is also presented
Keywords :
beam handling equipment; electromagnets; ion optics; measurement errors; particle beam diagnostics; particle beam stability; permanent magnets; proton beams; 8 GeV; Booster; Main Injector; combined function permanent magnets; electromagnets; magnetic measurements; optics model; optimized Fermilab 8-GeV transfer line; Apertures; Calibration; Extraterrestrial measurements; Laboratories; Magnetic field measurement; Magnetic variables measurement; Optical interconnections; Permanent magnets; Position measurement; Power supplies;
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
DOI :
10.1109/PAC.1999.795455