• DocumentCode
    345346
  • Title

    Commissioning of KEKB bunch feedback systems

  • Author

    Tobiyama, M. ; Kikutani, E.

  • Author_Institution
    KEK, Tuskuba, Japan
  • Volume
    2
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    1138
  • Abstract
    Commissioning of KEKB started at the end of the last year. In the early stages of the commissioning, we observed transverse instabilities in both rings and started tuning of the bunch feedback systems. Even though the tuning is now at the initial stage, the feedback systems are contributing to an increase of the maximum storable currents in the KEKB rings. Feedback-related systems, tune meters and bunch-current monitors, are also working well
  • Keywords
    accelerator control systems; colliding beam accelerators; electron accelerators; feedback; particle beam bunching; particle beam stability; storage rings; KEKB bunch feedback systems; bunch-current monitors; commissioning; feedback-related systems; storable currents; transverse instabilities; tune meters; Broadband amplifiers; Digital signal processing; Electrodes; Electron beams; Feedback; Feeds; Frequency; Large-scale systems; Positrons; Signal processing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.795474
  • Filename
    795474