Title :
Design of the Main Injector extraction beamlines
Author_Institution :
Fermi Nat. Accel. Lab., Batavia, IL, USA
Abstract :
The Main Injector (MI) supports the Tevatron fixed target and proton-antiproton collider modes of operation as well as providing 120 GeV/c resonantly extracted beam for the Main Injector Fixed Target Program. A set of beam transport lines, called A1 and P1, from the Main Injector converge on the injection point of the Tevatron, with the A1 being used to transport 150 GeV/c antiprotons (pbars) to the Tevatron. P1 is used to transport 150 GeV/c protons to the Tevatron, 120 GeV/c protons to the pbar target, and eventually 120 GeV/c resonantly extracted protons to the existing Fixed Target areas
Keywords :
beam handling equipment; colliding beam accelerators; particle beam extraction; particle beam injection; proton accelerators; synchrotrons; 120 GeV; 150 GeV; Fixed Target Program; Main Injector extraction beamlines; Tevatron fixed target; beam transport lines; proton-antiproton collider; Colliding beam accelerators; Colliding beam devices; Laboratories; Lattices; Magnetic switching; Particle beam injection; Particle beams; Proton accelerators; Resonance; Switches;
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
DOI :
10.1109/PAC.1999.795509