DocumentCode
345387
Title
RHIC Injection Kicker Power Supply System Control, Integration and Commission
Author
Zhang, W. ; Sanders, R. ; Fisher, W. ; Hoff, L.
Author_Institution
AGS Dept., Brookhaven Nat. Lab., Upton, NY, USA
Volume
2
fYear
1999
fDate
1999
Firstpage
1261
Abstract
The RHIC Yellow ring Fast Injection Kicker Power Supply System was successfully commissioned in January 1997 as part of the Sextant Test. Construction of an identical system for the Blue ring has been completed and will be commissioned during the 1999 RHIC start-up. Each of these Injection Kicker systems consists of four subsystems and a control system center. The four subsystems are located on a floating high voltage deck inside a protective caged room because of the unusual grounding of the structure. The kicker power supplies and auxiliary equipment jump to potentials as high as 10 kV during each pulse and must be inaccessible during operation. The RHIC Injection Kicker Power Supply System Control, Integration and Commissioning results are presented in this paper
Keywords
ion accelerators; particle beam injection; power supplies to apparatus; storage rings; synchrotrons; 10 kV; Injection Kicker Power Supply System; Integration; RHIC; auxiliary equipment; commission; control system; Communication system control; Control systems; Optical control; Optical fibers; Power supplies; Power system protection; Programmable control; Pulsed power supplies; Signal generators; Voltage control;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795515
Filename
795515
Link To Document