Title :
The upgrade of SRRC booster extraction system
Author :
Chiou, J.P. ; Chen, J.S. ; Fann, C.S. ; Ho, C.H. ; Hsu, K.T. ; Hsu, S.Y. ; Hwang, C.S. ; Lin, K.K. ; Sheu, J.T. ; Ueng, T.S.
Author_Institution :
SRRC, Hsinchu, Taiwan
Abstract :
It is planned to upgrade the SRRC booster from 1.3 GeV to 1.5 GeV for full energy injection into the storage ring before the end of 1999. Based on the technical specification and operation experience, it is concluded that some of the subsystem components need to be rebuilt, such as the magnet power supply systems and beam extraction elements. A review of the power supply system will be reported elsewhere. In this report, the brief review of the beam extraction process is given according to the 1.5 GeV parameters. The test result of a modified kicker magnet is presented
Keywords :
booster injectors; electron accelerators; particle beam extraction; storage rings; 1.5 GeV; SRRC booster extraction system upgrade; beam extraction elements; beam extraction process; full energy injection; magnet power supply systems; modified kicker magnet; operation experience; storage ring; subsystem components; technical specification; Coils; Electric breakdown; Electron beams; Fixtures; Insulation; Power supplies; Pulsed power supplies; Storage rings; Temperature; Testing;
Conference_Titel :
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location :
New York, NY
Print_ISBN :
0-7803-5573-3
DOI :
10.1109/PAC.1999.795578