DocumentCode
345463
Title
Tevatron performance goals for the coming decade
Author
Holmes, Stephen D.
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
Volume
1
fYear
1999
fDate
1999
Firstpage
43
Abstract
Fermilab is in the midst of a program to raise the luminosity in the Tevatron proton-antiproton collider by at least a factor of five above the currently achieved level of 1.6×1031 cm-2 sec-1. Components of this program include the construction of a new synchrotron, the Main Injector, a new antiproton storage ring, the recycler, and a variety of improvements to the existing antiproton source and Tevatron. Commissioning of these components will be underway in early 1999 with the next Tevatron collider run scheduled to start in April 2000. Initial commissioning experience with these systems will be described, along with developments underway to support further Tevatron luminosity enhancements over the coming decade
Keywords
antiproton sources; colliding beam accelerators; particle beam injection; proton accelerators; storage rings; synchrotrons; Main Injector; Tevatron performance goals; antiproton source; antiproton storage ring; commissioning; luminosity enhancements; proton-antiproton collider; recycler; synchrotron; Colliding beam accelerators; Colliding beam devices; Detectors; Laboratories; Large Hadron Collider; Particle beams; Proton accelerators; Storage rings; Structural beams; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795620
Filename
795620
Link To Document