• DocumentCode
    345526
  • Title

    DAΦNE operating experience

  • Author

    Guiducci, S.

  • Author_Institution
    LNF-INFN, Frascati, Italy
  • Volume
    1
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    277
  • Abstract
    Commissioning of the DAΦNE Φ-factory without experimental apparatus ended last November, when the construction of KLOE detector was complete. KLOE is presently being installed and operation with beam will resume next April for physics runs. We report in the following the DAΦNE performance achieved during the first phase of operation for single beam and colliding beams
  • Keywords
    colliding beam accelerators; electron accelerators; electron optics; particle beam dynamics; storage rings; DA Phi NE operating experience; KLOE detector; Phi-factory; colliding beams; single beam operation; Apertures; Detectors; Electron beams; Magnetic separation; Optical feedback; Positrons; Predictive models; Testing; Undulators; Vacuum systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.795683
  • Filename
    795683