Author :
Akai, K. ; Akasaka, N. ; Enomoto, A. ; Flanagan, J. ; Fukuma, H. ; Funakoshi, Y. ; Furukawa, K. ; Haba, J. ; Hiramatsu, S. ; Hosoyama, K. ; Huang, N. ; Ieiri, T. ; Iida, N. ; Kamitani, T. ; Kato, S. ; Kikuchi, M. ; Kikutani, E. ; Koiso, H. ; Kurokawa, S.I
Abstract :
The commissioning of the KEKB B-Factory storage rings started on Dec. 1, 1998. The two rings both achieved a stored current of over 0.5 A after operating for four months. The two beams were successfully collided several times. The commissioning stopped on Apr. 19, taking a 5-week break to install the Belle detector
Keywords :
colliding beam accelerators; electron accelerators; particle beam injection; particle beam stability; storage rings; Belle detector; Bhabha events; KEKB B-Factory storage rings; beam-beam deflection; commissioning; horizontal dipole correctors; longitudinal collision point; orbit drift; vertical beam-beam deflections; vertical bump orbit; Accidents; Detectors; Fires; History; Lattices; Linear particle accelerator; Particle beam injection; Particle beams; Storage rings; Synchrotron radiation;