DocumentCode
3455700
Title
Joint scheduling of distributed complex periodic and hard aperiodic tasks in statically scheduled systems
Author
Fohler, Gerhard
Author_Institution
Dept. of Comput. Sci., Massachusetts Univ., Amherst, MA, USA
fYear
1995
fDate
5-7 Dec 1995
Firstpage
152
Lastpage
161
Abstract
In this paper we present algorithms for the joint scheduling of periodic and aperiodic tasks in statically scheduled distributed real-time systems. Periodic tasks are precedence constrained, distributed, and communicating over the nodes of the systems. Both soft and hard aperiodic tasks are handled. After a static schedule has been created in a first step, the algorithms determine the amount and distribution of unused resources and leeway in it. These are then used to incorporate aperiodic tasks into the schedule by shifting the periodic tasks´ execution, without violating their feasibility. Run-time mechanisms are simple and require only little memory. Processors and communication nodes can be utilized fully. The algorithm performs on optimal online guarantee algorithm for hard aperiodic tasks of O(N). An extensive simulation study exhibits very high guarantee ratios for various load and deadline scenarios, which underlines the efficiency of our method
Keywords
distributed processing; processor scheduling; real-time systems; scheduling; aperiodic tasks; deadline scenarios; distributed real-time systems; guarantee ratios; joint scheduling; load; periodic tasks; precedence constrained; statically scheduled; Computational modeling; Computer science; Computer simulation; Dynamic scheduling; Process control; Processor scheduling; Real time systems; Runtime; Scheduling algorithm; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Real-Time Systems Symposium, 1995. Proceedings., 16th IEEE
Conference_Location
Pisa
ISSN
1052-8725
Print_ISBN
0-8186-7337-0
Type
conf
DOI
10.1109/REAL.1995.495205
Filename
495205
Link To Document