The accuracy of the power grid construction cost estimation is essential to the whole-process cost management. However, the estimation of the power grid project cost calculated by traditional methods varies largely, which cannot meet the needs of estimation accuracy. This paper proposes a case-based reasoning (CBR) method for estimating the power grid project cost. This method, supported by fuzzy mathematics, analytical hierarchy process (AHP) and rough set, makes full use of expert experiences and rule-based reasoning to improve the estimation accuracy that calculated only by the case-based reasoning method. And then, an actual case is involved in this paper to verify its scientificity and practicality. The case-based reasoning cost estimating method will provide valuable references for the cost decision-making in power grid projects.
Keywords :
case-based reasoning; estimation theory; fuzzy set theory; power engineering computing; power grids; power system economics; rough set theory; analytical hierarchy process; case-based reasoning method; decision-making; fuzzy mathematic; power grid construction cost estimation; power grid project cost; rough set theory; whole-process cost management; Accuracy; Costs; Decision making; Energy management; Fuzzy reasoning; Fuzzy sets; Mathematics; Power grids; Power systems; Project management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1743
Filename :
4679932
Link To Document :
بازگشت