• DocumentCode
    3457761
  • Title

    Queue Theory Based Algorithm for Material Lean Scheduling in Heavy Weight Parts Workshop

  • Author

    Lu Xiaohong ; Jia Zhenyuan ; Wang Fuji ; Liu Wei

  • Author_Institution
    Key Lab. for Precision, Dalian Univ. of Technol., Dalian
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The extensive management manner and the severe wastes have become the barriers to the development of the heavy weight parts machining workshop. The article advances a new heavy weight parts machining workshop material lean scheduling method under the guidance of lean production principles and queue theories. The new scheduling method considers the impact factors such as respective machining time of all the work areas, the service time and the velocity of the material-handling equipment synthetically. Select the total latency time of all the work areas, the answer times and the total moving distance of the material-handling equipment in a whole workday as target values of the material lean scheduling system. A simulation study is performed to compare the new heavy weight parts machining workshop lean scheduling scheme with the traditional scheduling methods. The ultimate simulation results show that the designed new scheduling method is superior to the traditional ones evidently.
  • Keywords
    lean production; machining; materials handling equipment; queueing theory; scheduling; heavy weight parts machining; heavy weight parts workshop; lean production principles; material lean scheduling; material-handling equipment; queue theory; workshop scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.1763
  • Filename
    4679952