Title :
The Research of the Settlement Model in Construction Contract Price Based on the Time Value
Author :
Xiang, Jianguo ; Yu, Huigang
Author_Institution :
Zhejiang Coll. of Constr., Hangzhou
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
3
Abstract :
This paper establishes a model of equivalent price settlement (time-dependent) in engineering construction contracts brought by the principle of time value of capital and completes a sensitivity analysis to the value realization of the contract price from three aspects of the changes in rate of return on investments, settlement frequency and cascade reduced settlement of the project. The calculating analysis proves that the time value of capital is an objective existence, which requires construction companies to speed cash flow, early recovery of funds, meanwhile, it also calls for changing the current manner of equivalent price settlement (time-independent).
Keywords :
civil engineering; construction industry; contracts; investment; sensitivity analysis; cascade reduced settlement; construction contract price; engineering construction contract; sensitivity analysis; settlement frequency; time value of capital; Building materials; Costs; Forward contracts; Frequency; Investments; Sensitivity analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1780
Filename :
4679969
Link To Document :
بازگشت