DocumentCode
3458080
Title
Simulation-Based Estimation for Product Development Processes
Author
Zhang Weimin ; Zhu Mincai ; Chen Hongmin
Author_Institution
BACC, Beijing Aerosp. Control Center, Beijing
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
4
Abstract
Sequential iterative process is a kind of basic product development process. In order to manage and improve this kind of processes, a simulative model and simulation arithmetic for estimating the expect time of sequential iterative development process was proposed. The rework impact factors in the model affect the remaining time of the rework tasks other than the task duration. The performance parameters in the model might be random variables. A simulation experiment for process time estimation was presented by an example of iterative software test processes.
Keywords
program testing; software maintenance; software process improvement; software prototyping; iterative software test processes; process time estimation; product development processes; rework impact factors; sequential iterative process; simulation-based estimation; Aerospace control; Aerospace simulation; Analytical models; Arithmetic; Computational modeling; Computer simulation; Product development; Random variables; Software testing; Space technology;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1783
Filename
4679972
Link To Document