DocumentCode :
3458158
Title :
Method Study of Software Project Schedule Estimation Guide
Author :
Zhang Jun-guang
Author_Institution :
Sch. of Econ. & Manage., Univ. of Sci. & Technol. Beijing, Beijing
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
4
Abstract :
To ensure the estimation accuracy of software project schedule and improve the timely completion of the projects, a quantitative estimation guide of software project was studied combined with some actual project cases. A non-linear regression curve was obtained by the use of statistical analysis methods, on base of this a schedule estimation guide model was built and the use of the model was studied. By the significant test of this model, we found that the regression effect is not significant. That means the schedule is not only affected by the effort, but also by many other factors, this function can only be used to verify the reasonableness of the estimated results of the schedule, and could not be used to be a direct basis for schedule arrangement. The actual data shows that this model could provide help for the schedule estimation, and could improve the schedule estimation accuracy.
Keywords :
project management; regression analysis; scheduling; software cost estimation; software development management; nonlinear regression curve; software project schedule estimation guide; statistical analysis; Costs; Project management; Scheduling; Software engineering; Software quality; Statistical analysis; Technology management; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1788
Filename :
4679977
Link To Document :
بازگشت