DocumentCode :
3458517
Title :
A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent
Author :
Yang, Lixi ; Fu, Yan ; Li, Shiqi ; Huang, Baoxia ; Peng Tao
Author_Institution :
Sch. of Mech. Sci. &Eng., Huazhong Univ. of Sci. & Technol., Wuhan
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
4
Abstract :
Three attributes relevant to a specific project, including the number of activities in chain, the uncertainty of activities duration and the flexibility of activities start time, were introduced into critical chain project management for sizing buffer. By means of simulation research, the impact of these three attributes on project scheduling in terms of two performance indicators: project duration and on time completion was evaluated. Based on the analyses of simulation experiment, a revised method for sizing buffer was proposed. The case indicates that the performance of project scheduling is significantly improved by using the revised method.
Keywords :
critical path analysis; planning; project management; scheduling; activity duration uncertainty; activity start time; attribute dependent; buffer sizing approach; critical chain project management; critical chain scheduling; project duration performance indicator; project planning; project time completion performance indicator; Analytical models; Contracts; Delay effects; Environmental management; Gaussian distribution; Project management; Protection; Random variables; Scheduling; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1805
Filename :
4679994
Link To Document :
بازگشت