Research on Time-Cost Optimization Model of Construction Projects
Author
Huang, Jian-Wen ; Wang, Xing-Xia ; Zhou, Yi-Hong
Author_Institution
Coll. of Economic & Manage., China Three Gorges Univ., Yichang
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
4
Abstract
Time-cost optimization problem is one of the most important aspects of construction project planning and control. Construction planners must select appropriate resources, including crew size, equipment, methods and technologies to perform tasks of a construction project. In general, there is a trade-off between time and cost to complete a task; the less expensive the resources, the long it takes. Such problems are difficult to solve because they do not have unique solutions. Especially for large construction projects, the current research on project duration optimization cannot meet the growing demands because it is so complicated and there are so many uncertain problems in it. On the basis of Critical Path Method (CPM), this paper analyzed the relationship between time and cost, established time-cost optimization models of construction projects and obtained the condition of optimizing duration. It provides scientific basis for project decision-making and supports the decider powerfully.
Keywords
construction industry; decision making; optimisation; planning; project management; construction planners; construction projects; critical path method; decision-making; project planning; time-cost optimization model; Cost function; Delay effects; Educational institutions; Engineering management; Laboratories; Optimization methods; Power generation economics; Project management; Resource management; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.1813
Filename
4680002
Link To Document