A Method of Saving Cost Based on Safety Floats and Minimum Cut Algorithm in Project Management
Author :
Zhang, Lihui ; Zhang, Sufang ; Qi, Jianxun
Author_Institution :
Sch. of Bus. Adm., North China Electr. Power Univ., Beijing
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
5
Abstract :
This paper studies the method of saving cost in project management by making use of floats. Firstly, it puts forward the critical path theorem and the safety float phenomenon, reveals the conditions that a new critical path appears and the properties of safety float in the process of its use. It then proposes a method that can maximize cost saving without new critical path or new critical activity appearing in project management on the basis of the minimum cut algorithm, and the method is proved to be correct. The paper also gives an example of its application. The method is helpful for project managers to enhance the efficiency of the use of floats.
Keywords :
costing; critical path analysis; project management; critical path theorem; minimum cut algorithm; project management; safety float phenomenon; safety floats; saving cost method; Costs; Electrical safety; Entropy; Heuristic algorithms; Interference; Large-scale systems; Optimal scheduling; Particle swarm optimization; Project management; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.1838
Filename :
4680027
Link To Document :
بازگشت