    A Method of Saving Cost Based on Safety Floats and Minimum Cut Algorithm in Project Management

  • Author

    Zhang, Lihui ; Zhang, Sufang ; Qi, Jianxun

  • Author_Institution
    Sch. of Bus. Adm., North China Electr. Power Univ., Beijing
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper studies the method of saving cost in project management by making use of floats. Firstly, it puts forward the critical path theorem and the safety float phenomenon, reveals the conditions that a new critical path appears and the properties of safety float in the process of its use. It then proposes a method that can maximize cost saving without new critical path or new critical activity appearing in project management on the basis of the minimum cut algorithm, and the method is proved to be correct. The paper also gives an example of its application. The method is helpful for project managers to enhance the efficiency of the use of floats.
  • Keywords
    costing; critical path analysis; project management; critical path theorem; minimum cut algorithm; project management; safety float phenomenon; safety floats; saving cost method; Costs; Electrical safety; Entropy; Heuristic algorithms; Interference; Large-scale systems; Optimal scheduling; Particle swarm optimization; Project management; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.1838
  • Filename
    4680027