The traditional methods used by system planners to maintain acceptable bulk system reliability are challenged by incorporating higher wind power penetration levels. This difficulty can be alleviated by combining deterministic considerations with probabilistic assessment in order to evaluate the quantitative system risk and conduct system development planning. This paper extends the joint deterministic-probabilistic approach to wind integrated bulk power system planning. This paper presents technical and economic assessments using probabilistic and the joint deterministic-probabilistic methods in large wind integrated bulk system planning. This paper also illustrates a comparison of the two methods for long-term bulk system planning.
Keywords :
power generation economics; power generation planning; probability; wind power plants; bulk system reliability; conduct system development; economic assessments; joint deterministic-probabilistic method; large wind integrated bulk power system reinforcement planning; long-term bulk system planning; quantitative system risk development; wind power penetration levels; Wind integrated bulk systems; deterministic; probabilistic; reinforcement planning;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Reliability of Transmission and Distribution Networks (RTDN 2011), IET Conference on
Conference_Location :
London
Type :
conf
DOI :
10.1049/cp.2011.0518
Filename :
6162260
Link To Document :
بازگشت