  • Abstract
    This article shows an analysis of the electrical parameters of a three-phase transmission line section using a relatively new design for steel towers characterized by 280 meters high. These main features, the height of the line conductors and distance between them, are intrinsically related to the longitudinal and transversal parameters of the line. By this means, an analysis was carried out in order to show the electrical variations between a transmission line using the new technology and a conventional 440-kV line through a wide range of frequencies and a variable soil resistivity.
  • Keywords
    overhead line conductors; poles and towers; power overhead lines; Northern Brazil; line conductors; size 280 m; steel towers; three-phase transmission line section; voltage 440 kV; Brazilian electric system; Transmission line; line parameters; tall towers;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Reliability of Transmission and Distribution Networks (RTDN 2011), IET Conference on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/cp.2011.0533
  • Filename
    6162276