Title :
Extreme re: what if there is no time for requirements engineering?
Author :
Greenspan, Sol J.
Author_Institution :
Verizon Communications Inc.
Keywords :
Bicycles; Costs; Documentation; Error correction; Performance evaluation; Phase detection; Process control; Scheduling; Time factors; Time to market;
Conference_Titel :
Requirements Engineering, 2001. Proceedings. Fifth IEEE International Symposium on
Print_ISBN :
0-7695-1125-2
DOI :
10.1109/ISRE.2001.948585