DocumentCode :
3460967
Title :
Extreme re: what if there is no time for requirements engineering?
Author :
Greenspan, Sol J.
Author_Institution :
Verizon Communications Inc.
fYear :
2001
fDate :
2001
Firstpage :
282
Lastpage :
284
Keywords :
Bicycles; Costs; Documentation; Error correction; Performance evaluation; Phase detection; Process control; Scheduling; Time factors; Time to market;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Requirements Engineering, 2001. Proceedings. Fifth IEEE International Symposium on
Print_ISBN :
0-7695-1125-2
Type :
conf
DOI :
10.1109/ISRE.2001.948585
Filename :
948585
Link To Document :
بازگشت