Early assessment of grid code requirements for wind power plant in vestas
Author :
Zhan, Y.Q. ; Zhao, P.
Author_Institution :
Vestas Technol. R&D, Singapore, Singapore
fYear :
2010
fDate :
21-24 June 2010
Firstpage :
2050
Lastpage :
2055
Abstract :
Grid code requirements on wind power plant are becoming more stringent as the wind power penetration level increasing. In order to identify the risk of incompliance with grid code requirements at the planning stage of a wind power plant project, a standard grid code study process has been established in Vestas. The study process includes steady state load flow, short circuit studies and transient low voltage ride through study. A suitable reactive power compensation device is identified from the study. An example study case is also included in this paper.
Keywords :
load flow; power grids; reactive power; wind power plants; Vestas; grid code requirements; reactive power compensation device; short circuit studies; steady state load flow; transient low voltage ride through study; wind power penetration level; wind power plant project; Frequency; Power quality; Power system faults; Power system harmonics; Power system restoration; Power system transients; Reactive power; Voltage fluctuations; Wind energy; Wind turbines; Grid code; low voltage ride through; reactive power compensation; wind power plant;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Electronics Conference (IPEC), 2010 International
Conference_Location :
Sapporo
Print_ISBN :
978-1-4244-5394-8
Type :
conf
DOI :
10.1109/IPEC.2010.5543449
Filename :
5543449
Link To Document :
بازگشت