Abstract
Grid code requirements on wind power plant are becoming more stringent as the wind power penetration level increasing. In order to identify the risk of incompliance with grid code requirements at the planning stage of a wind power plant project, a standard grid code study process has been established in Vestas. The study process includes steady state load flow, short circuit studies and transient low voltage ride through study. A suitable reactive power compensation device is identified from the study. An example study case is also included in this paper.
Keywords
load flow; power grids; reactive power; wind power plants; Vestas; grid code requirements; reactive power compensation device; short circuit studies; steady state load flow; transient low voltage ride through study; wind power penetration level; wind power plant project; Frequency; Power quality; Power system faults; Power system harmonics; Power system restoration; Power system transients; Reactive power; Voltage fluctuations; Wind energy; Wind turbines; Grid code; low voltage ride through; reactive power compensation; wind power plant;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Electronics Conference (IPEC), 2010 International
Conference_Location
Sapporo
Print_ISBN
978-1-4244-5394-8
Type
conf
DOI
10.1109/IPEC.2010.5543449
Filename
5543449
Link To Document