• DocumentCode
    3463619
  • Title

    Data quality and flowshop scheduling results

  • Author

    Bonjour, Eric ; Baptiste, Pierre ; Larcheveque, David

  • Author_Institution
    CNRS, Besancon, France
  • fYear
    1997
  • fDate
    9-12 Sep 1997
  • Firstpage
    87
  • Lastpage
    92
  • Abstract
    Few works have been done on the impact of poor data quality on scheduling and planning. This paper presents two dimensions of data quality: accuracy and granularity of attributes. After the modelling of data inaccuracy by different methods, the authors develop simulation experiments in the field of flowshop scheduling so as to study the impact of inaccuracy on scheduling (heuristics sensitivity). These results are extended to the granularity of attributes. This work intends to set reasonable limits to the algorithm design according to limits of data quality
  • Keywords
    computer aided production planning; data integrity; database management systems; optimisation; production control; data accuracy; data quality; flowshop scheduling; granularity; heuristics sensitivity; manufacturing database; production planning; Algorithm design and analysis; Computer science; Costs; Databases; Job shop scheduling; Processor scheduling; Production management; Production planning; Scheduling algorithm; Software maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation Proceedings, 1997. ETFA '97., 1997 6th International Conference on
  • Conference_Location
    Los Angeles, CA
  • Print_ISBN
    0-7803-4192-9
  • Type

    conf

  • DOI
    10.1109/ETFA.1997.616249
  • Filename
    616249