DocumentCode
3467074
Title
Feature Teams Collaboratively Building Products from READY to DONE
Author
Frank, Andre ; Hartel, Charles
Author_Institution
Liquidnet Holdings, Inc., New York, NY, USA
fYear
2009
fDate
24-28 Aug. 2009
Firstpage
320
Lastpage
325
Abstract
In this paper we describe our Project Teampsilas journey from a process where design and planning work was performed away from development team to one where small cross-functional Feature Teams self-organized to complete design, planning, and construction within the same sprint. We introduced a process that allows User Interaction Designers and Business Analysts to work in sync with the Developers and QA Analysts within a sprint. Each member of the Feature Team is involved in getting READY, planning, executing and being DONE. By introducing this process, we observed an increase in team morale, better, more predictable results and accumulation of less debt, while at the same time maintaining a constant velocity. Our process is a deviation from the established approach where upfront work needs to be ready before starting a sprint.
Keywords
commerce; design; groupware; planning; quality assurance; user interfaces; QA analysts; business analysts; collaborative work; design; planning; user interaction; Buildings; Collaboration; Collaborative work; Meeting planning; Process planning; Product development; Production systems; Project management; Quality management; Teamwork;
fLanguage
English
Publisher
ieee
Conference_Titel
Agile Conference, 2009. AGILE '09.
Conference_Location
Chicago, IL
Print_ISBN
978-0-7695-3768-9
Type
conf
DOI
10.1109/AGILE.2009.51
Filename
5261063
Link To Document