    Research on The Model of Concession Pricing of BOT Project of Sewage Treatment: Based on Real Option and Time Series

  • Author

    Yongbo Yuan ; Ailin Wang

  • Author_Institution
    Civil Eng. Dept., Dalian Univ., Dalian
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Empirical study of sewage treatment projects in Dalian reflects that concession price is a critical factor in the negotiation of BOT (build-operation-transfer) . Aimed to the flaws of the existing models, relevant elements of a contractual package are treated as a form of real option. At the same time, a model called ARMA (an autoregressive-moving average process of order) is used to estimate one key variable of the Black-Scholes model. After calculating, the result is smaller than that calculated by other traditional models. So, using this method, governments´ guarantees or alternative forms are evaluated quantitatively, which means this method strikes a balance between risk and benefit.
  • Keywords
    autoregressive moving average processes; contracts; government; pricing; sewage treatment; time series; Black-Scholes model; Dalian; autoregressive-moving average process; build-operation-transfer; concession pricing; contractual package; governments; real option; sewage treatment projects; time series; Civil engineering; Contracts; Cost accounting; Environmental economics; Government; Packaging; Pricing; Security; Sewage treatment; Sludge treatment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.2344
  • Filename
    4680533