• DocumentCode
    3469776
  • Title

    Bottleneck-centric pull and push allocation and sequencing of wet-bench and furnace tools

  • Author

    Yu-Ting Kao ; Shun-Cheng Zhan ; Shi-Chung Chang

  • Author_Institution
    Nat. Taiwan Univ., Taipei, Taiwan
  • fYear
    2013
  • fDate
    6-6 Sept. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Furnace tool group is often a bottleneck of semiconductor fabrication, which makes effective scheduling of furnace tools and its upstream tool group, wet-bench, important to operation efficiency. Major challenges come from not only the problem complexity such as batching requirements, internal tool sequence, and waiting time limitations but also a reasonable computation time for rescheduling. This paper develops a novel solution scheme, a push-and-then-pull bottleneck centric integrated allocation and sequencing method (P&P BCIASM), to integrate the sequencing and allocation for wafers processing by wet bench and furnace tools effectively. Furnace tool allocations, first derived from a coarse wet-fine furnace model, are viewed as pull demands for allocating and sequencing wet-bench tools. The allocations of wet tools thus obtained are considered as push supplies for refining the scheduling of furnace tools. A commonly available optimization tool is skillfully applied to solution finding. Test results over problem instances extracted from real fab data demonstrate that P&P BCIASM leads to near-optimal schedules, 2.56% higher utilization in average than a hybrid allocation scheme of optimization and manual adjustment, and 15.04% mean waiting time reductions. The violation of waiting time limitation is reduced to none. The computation time in average is within one minute, indicating a strong potential for applications to both large size problems and dynamic allocations.
  • Keywords
    batch processing (industrial); furnaces; optimisation; push-pull production; resource allocation; semiconductor device manufacture; BClASM; batching requirements; bottleneck-centric pull-push allocation; furnace tool scheduling; internal tool sequence; mean waiting time reductions; near-optimal schedules; optimization; rescheduling; semiconductor fabrication; sequencing; wafer processing; waiting time limitations; wet bench tools; Computer aided software engineering; Furnaces; Job shop scheduling; Lead; Optimization; Resource management; Sequential analysis; bottleneck-centric pull and push solution scheme; efficiency; optimization; tool allocation and sequencing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    e-Manufacturing & Design Collaboration Symposium (eMDC), 2013
  • Conference_Location
    Hsinchu
  • Type

    conf

  • DOI
    10.1109/eMDC.2013.6756048
  • Filename
    6756048