• DocumentCode
    3470400
  • Title

    Improvement of Gencos´ maintenance schedule in a deregulated power system

  • Author

    Tabari, N. Mohammadi ; Mahmoudi, S.N. ; Hassanpour, S.A. ; Hassanpou, S.B. ; Pirmoradian, M.

  • Author_Institution
    Deputy of Eng. & Distribution Plans, Moshanir Consultant Eng. Co., Tehran, Iran
  • Volume
    2
  • fYear
    2004
  • fDate
    21-24 Nov. 2004
  • Firstpage
    1722
  • Abstract
    This paper provides the maintenance schedule of a GENCO in a deregulated power system. It is shown that the goal of maintenance plan in the new structure is different from the traditional centralized power systems. The modeling of maintenance scheduling problem in a competitive environment is demonstrated by taking into account that the main purposes of GENCOs are selling electricity as much as possible and making higher profit. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. Applying mixed-integer programming optimization method on a benchmark and make a discussion about the simulation results, make the last part.
  • Keywords
    integer programming; maintenance engineering; power markets; power system economics; profitability; Gencos maintenance schedule; deregulated power system; electricity selling; mixed-integer programming optimization method; open systems; power generation maintenance; power system modeling; power system planning; Electricity supply industry deregulation; Job shop scheduling; Optimization methods; Power engineering and energy; Power generation; Power generation economics; Power system management; Power system modeling; Power system simulation; Power systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
  • Print_ISBN
    0-7803-8610-8
  • Type

    conf

  • DOI
    10.1109/ICPST.2004.1460281
  • Filename
    1460281