    Co-simulation on Automatic Pouring of Truck-mounted Concrete Boom Pump

  • Author

    Zhou, Shuwen ; Zhang, Siqi

  • Author_Institution
    Northeastern Univ., Shenyang
  • fYear
    2007
  • fDate
    18-21 Aug. 2007
  • Firstpage
    928
  • Lastpage
    932
  • Abstract
    A concept of automatic concrete pouring of truck- mounted concrete boom pump was presented and discussed. Then the concrete pouring process and the kinematics of the boom sections were analyzed, including the inverse kinematics problem. Transient dynamic analysis was performed to validate the impact of new control system on the boom base on the flexible body co-simulation between ANSYS and ADAMS. A 3D simulation was programmed to imitate the process of automatic pouring and verify the control algorithm. The simulation result shows that the system can pour concrete on a long narrow field automatically, and the boom´s movement is smooth.
  • Keywords
    concrete; construction industry; fork lift trucks; pumps; transient analysis; 3D simulation; automatic concrete pouring; automatic pouring cosimulation; transient dynamic analysis; truck-mounted concrete boom pump; Automatic control; Automation; Concrete; Control systems; Hoses; Kinematics; Manipulators; Mechanical engineering; Pumps; Transient analysis; Automatic Pouring; Boom Pump; Co-simulation; Transient Dynamic;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation and Logistics, 2007 IEEE International Conference on
  • Conference_Location
    Jinan
  • Print_ISBN
    978-1-4244-1531-1
  • Type

    conf

  • DOI
    10.1109/ICAL.2007.4338699
  • Filename
    4338699