DocumentCode :
3471540
Title :
Change point estimation in multi-attribute processes
Author :
Niaki, S.T.A. ; Khedmati, M.
Author_Institution :
Dept. of Ind. Eng., Sharif Univ. of Technol., Tehran, Iran
fYear :
2011
fDate :
14-17 Sept. 2011
Firstpage :
580
Lastpage :
584
Abstract :
Identification of the change point in multi-attribute processes make the corrective measures to be employed sooner. This of course results in considerable amount of time and money savings. In real-world problems, since most of the process changes are due to instantaneous causes (step-change), a new method is proposed in this paper to derive the maximum likelihood estimator of the time of a step-change in the mean vector of multi-attribute processes. The results of a performance study based on a numerical example are encouraging.
Keywords :
control charts; maximum likelihood estimation; quality control; change point estimation; corrective measures; instantaneous cause method; maximum likelihood estimation; mean vector; multiattribute processes; step change method; Control charts; Correlation; Covariance matrix; Gaussian distribution; Maximum likelihood estimation; Monitoring; Process control; Change Point Estimation; Maximum Likelihood Estimator; Multi-attribute Processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Quality and Reliability (ICQR), 2011 IEEE International Conference on
Conference_Location :
Bangkok
Print_ISBN :
978-1-4577-0626-4
Type :
conf
DOI :
10.1109/ICQR.2011.6031606
Filename :
6031606
Link To Document :
بازگشت