Abstract :
The conventional load density method that forecasts future demand divides the whole service area into a set of small areas, forecasting the load with single load simultaneity. Based on this load, the localities and capacities of substation equipments are planned. However, the result is that the capacities of low voltage (10 kV) substation are lower than the actual need, and the capacities of high voltage (220 kV) substations higher. To solve the problem, the concept of multi-level simultaneity and its forecasting models are introduced, and then a multi-level load system is constructed. The practical sample shows that the proposed method effectively solves the problems described above, and the matching between substation capacity and actual power needs in their respective localities is more rational.
Keywords :
load forecasting; load density method; load forecasting; multi-level load system; multi-level simultaneity technique; substation capacity; substation equipments; voltage 10 kV; voltage 220 kV; Demand forecasting; Investments; Load forecasting; Low voltage; Power engineering and energy; Power supplies; Power system planning; Power systems; Predictive models; Substations; load density; load forecasting; multi-level load; multi-level simultaneity;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Utility Deregulation and Restructuring and Power Technologies, 2008. DRPT 2008. Third International Conference on
Conference_Location :
Nanjuing
Print_ISBN :
978-7-900714-13-8
Electronic_ISBN :
978-7-900714-13-8
Type :
conf
DOI :
10.1109/DRPT.2008.4523621
Filename :
4523621
Link To Document :
بازگشت