DocumentCode :
3472008
Title :
Effects of implementing 5S on Total Productive Maintenance: A case in Iran
Author :
Moradi, Mehdi ; Abdollahzadeh, M.R. ; Vakili, Arash
Author_Institution :
Ind. Eng. Dept., Urmia Univ. of Technol., Urmia, Iran
fYear :
2011
fDate :
14-17 Sept. 2011
Firstpage :
41
Lastpage :
45
Abstract :
In this paper relations between 5S and pillars of Total Productive Maintenance (TPM) are explicated. In order to evaluate performance and effectiveness of 5S, we have benefited from a checklist by which status of implementation and execution of 5S in a foodstuff production factory in Iran has been studied. Furthermore, effects of this implementation on development and maturity of TPM is evaluated.
Keywords :
food processing industry; maintenance engineering; Iran; foodstuff production factory; total productive maintenance; Companies; Maintenance engineering; Personnel; Production; Safety; Training; 5S; Iran; Maintenance; TPM;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Quality and Reliability (ICQR), 2011 IEEE International Conference on
Conference_Location :
Bangkok
Print_ISBN :
978-1-4577-0626-4
Type :
conf
DOI :
10.1109/ICQR.2011.6031678
Filename :
6031678
Link To Document :
بازگشت