• DocumentCode
    3475331
  • Title

    Notation and typology for the hoist scheduling problem

  • Author

    Bloch, C. ; Manier, M. -A

  • Author_Institution
    CNRS, Besancon, France
  • Volume
    6
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    475
  • Abstract
    The hoist scheduling problem (HSP) often arises in electroplating industry. The problem involves scheduling the processing and/or transport operations of products. Products are moved between treatment resources by material handling devices (hoists). This problem is different from classical scheduling problems because it includes various and sometimes particular constraint. The production environment to be dealt with depends on the number and the type of processing specifications to be considered. The important literature related to the HSP shows that many searchers have proposed many approaches to solve the various encountered cases. Those observations lead us to propose a notation and a typology for the hoist scheduling problem. This work aims at making easier the communication between searchers and/or industrials in surface treatment area, by allowing an exact identification of the various studied cases and a comparison of the obtained results
  • Keywords
    electroplating; hoists; materials handling; production control; electroplating industry; hoist scheduling; materials handling; production control; surface treatment; typology; Cleaning; Communication industry; Conductivity; Gold; Job shop scheduling; Materials handling; Production; Surface resistance; Surface treatment; Zinc;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1999. IEEE SMC '99 Conference Proceedings. 1999 IEEE International Conference on
  • Conference_Location
    Tokyo
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-5731-0
  • Type

    conf

  • DOI
    10.1109/ICSMC.1999.816598
  • Filename
    816598