• DocumentCode
    3476921
  • Title

    Automatic reclosure requirements on heavy loaded transmission lines

  • Author

    Bartylak, A. ; Carolin, T.

  • Author_Institution
    ESKOM Transmission
  • fYear
    2005
  • fDate
    11-15 July 2005
  • Firstpage
    156
  • Lastpage
    162
  • Abstract
    Increasing number of unsuccessful attempts to close the transmission feeders either automatically or manually as a result of increased loading of the ESKOM EHV transmission system prompted an investigation into possible improvements of automatic reclosure (ARC) philosophy. Analysis of failures led to increased settings of permitted synchronizing angles between incoming and running voltages, reduced required synchronization voltage levels as well as changes to the ARC cycle. In this paper recommended changes and evaluation of their possible impact on the transmission´s customers are presented. Described changes are presently being implemented on the ESKOM transmission system with an aim to enhance restoration of supply and prevent development of system incidents into a major events thus improving system reliability particularly in most onerous, heavy loaded conditions
  • Keywords
    fault diagnosis; power system restoration; power transmission lines; power transmission reliability; synchronisation; ESKOM EHV transmission system; automatic reclosure philosophy; automatic reclosure requirements; supply restoration; system incidents; system reliability; Circuit faults; Fires; Frequency synchronization; Lightning; Power system restoration; Power system security; Power system transients; Protection; Transmission lines; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Inaugural Conference and Exposition in Africa, 2005 IEEE
  • Conference_Location
    Durban
  • Print_ISBN
    0-7803-9326-0
  • Type

    conf

  • DOI
    10.1109/PESAFR.2005.1611806
  • Filename
    1611806