DocumentCode :
3477023
Title :
Research on preventive maintenance period of hydroelectric power equipments
Author :
Zhong-Zhe Chen ; Pei-yu Ren ; Dong Wang
Author_Institution :
Sch. of Mechatron. Eng., Univ. of Electron. Sci. & Technol. of China, Chengdu, China
fYear :
2010
fDate :
12-14 Jan. 2010
Firstpage :
1
Lastpage :
3
Abstract :
In this paper, the failure number of hydroelectric power equipments in the whole life is predicted based on Crow-AMSAA Reliability Growth model. Considering influence of preventive maintenance to failure rate, service age reduction factor E is introduced to adjust service year of equipment and the maintenance cost model of hydroelectric equipments in the life cycle is derived. The optimal preventive maintenance period with minimum operation cost has been found. A new method to determine the cycle of the timed preventive maintenance for hydroelectric equipments has been proposed in this paper, which will be useful for maintenance management of electric power equipment.
Keywords :
hydroelectric power stations; life cycle costing; power apparatus; power markets; preventive maintenance; research and development; Crow-AMSAA reliability growth model; hydroelectric power equipments; maintenance cost model; minimum operation cost; preventive maintenance period; Availability; Cost function; Hydroelectric power generation; Mechatronics; Power system reliability; Predictive models; Preventive maintenance; Reliability engineering; Statistics; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Prognostics and Health Management Conference, 2010. PHM '10.
Conference_Location :
Macao
Print_ISBN :
978-1-4244-4756-5
Electronic_ISBN :
978-1-4244-4758-9
Type :
conf
DOI :
10.1109/PHM.2010.5413565
Filename :
5413565
Link To Document :
بازگشت