• DocumentCode
    3478933
  • Title

    Construction of a dam embankment with nonstationary queues

  • Author

    Ioannou, Photios G.

  • Author_Institution
    Dept. of Civil & Environ. Eng., Michigan Univ., Ann Arbor, MI, USA
  • Volume
    2
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    921
  • Abstract
    The paper presents the simulation model for a project involving the haulage and placement of rip-rap for the construction of a dam to illustrate how traffic-related queues are created at locations determined dynamically at simulation runtime. This example also investigates the formation of moving queues of equipment that cannot pass each other and travel together like a procession or a convoy. The solution to this problem is outlined conceptually using the activity-scanning modeling paradigm and is described in detail using a simulation model developed in STROBOSCOPE
  • Keywords
    building; civil engineering computing; dams; digital simulation; queueing theory; simulation languages; STROBOSCOPE; State and Resource Based Simulation of Construction Processes; activity-scanning modeling paradigm; construction operations; convoy; dam embankment construction; moving queues; nonstationary queues; rip-rap; simulation language; simulation model; simulation runtime; traffic-related queues; Building materials; Civil engineering; Contracts; Levee; Load modeling; Production; Road transportation; Road vehicles; Runtime; Traffic control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference Proceedings, 1999 Winter
  • Conference_Location
    Phoenix, AZ
  • Print_ISBN
    0-7803-5780-9
  • Type

    conf

  • DOI
    10.1109/WSC.1999.816800
  • Filename
    816800