DocumentCode :
3480636
Title :
Minimizing total weighted completion time on a batch-processing machine with re-entrance
Author :
Zheng, Rui ; Li, Hongyu
Author_Institution :
Dept. of Manage. Sci. Sch. of Manage., Fudan Univ. Shanghai, Shanghai, China
fYear :
2009
fDate :
5-7 Aug. 2009
Firstpage :
1791
Lastpage :
1794
Abstract :
The single batch-processing machine scheduling problem with re-entrance to minimize total weighted completion time is considered, where the capacity of the machine is infinite and there are different processing types in the same machine. This problem can be transformed into a model with parallel chains precedence constraint. A polynomial time heuristic algorithm for the problem is given. Experimentation results show that the algorithm is efficient.
Keywords :
batch processing (industrial); computational complexity; minimisation; single machine scheduling; steel industry; parallel chain precedence constraint; polynomial time heuristic algorithm; re-entrance model; single batch-processing machine scheduling problem; steel manufacturing; total weighted completion time minimization; Automation; Billets; Circuit testing; Conference management; Heat treatment; Heuristic algorithms; Job shop scheduling; Logistics; Polynomials; Project management; Scheduling; batch-processing; chains precedence constraints; heuristic algorithm; re-entrance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation and Logistics, 2009. ICAL '09. IEEE International Conference on
Conference_Location :
Shenyang
Print_ISBN :
978-1-4244-4794-7
Electronic_ISBN :
978-1-4244-4795-4
Type :
conf
DOI :
10.1109/ICAL.2009.5262674
Filename :
5262674
Link To Document :
بازگشت