DocumentCode :
3483847
Title :
High average current-high repetition thyratron testing at ETDL
Author :
Mcgowan, Joseph ; Creedon, John ; Perkuhn, Peter
Author_Institution :
US Army Electron. Tech. & Dev. Lab., Fort Monmouth, NJ, USA
fYear :
1988
fDate :
20-22 Jun 1988
Firstpage :
156
Lastpage :
158
Abstract :
The US Army´s Pulse Power Center´s high-power-thyratron test facility was expanded to include the capability of evaluating switch performance at high repetition rates in either a pulse-forming network or a capacitor circuit. In addition to the existing 4 Ω network, an RLC circuit was installed. The facility was designed to test thyratrons at 55 A of average current for run times of 100 s. The system has operated reliably at 25 kV and at peak currents of 3 and 6 kA at repetition rates up to 5 kHz. A common resonant charge circuit was also installed for high-repetition-rate operation. Thyratrons from two manufacturers are being tested
Keywords :
test facilities; testing; thyratrons; 100 s; 25 kV; 3 to 6 kA; 4 ohm; 5 kHz; 55 A; capacitor circuit; common resonant charge circuit; high repetition rates; high-power-thyratron test facility; pulse-forming network; switch performance; Circuit testing; Pulse circuits; RLC circuits; Resonance; Switched capacitor circuits; Switched capacitor networks; Switches; Switching circuits; Test facilities; Thyratrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Modulator Symposium, 1988. IEEE Conference Record of the 1988 Eighteenth
Conference_Location :
Hilton Head, SC
Type :
conf
DOI :
10.1109/MODSYM.1988.26258
Filename :
26258
Link To Document :
بازگشت